ITEM DETAILS
CEC #4967
Year2016
Date Received2016-09-29
ApplicantMethanol Holdings Trinidad Limited
Project DescriptionThe establishment of a 350m (14 inch) diameter natural gas pipeline, 3.2km in length,
Designated Activity27
Locationfrom De Novo Energy Limited's natural gas processing facility to MHTL's M4 methanol plant along Caspian Drive, Point Lisas Industrial Estate, Couva
StatusIssued CEC
Status Date2017-05-12