| ITEM | DETAILS |
|---|---|
| CEC # | 4901 |
| Year | 2016 |
| Date Received | 2016-07-18 |
| Applicant | Range Resources Trinidad Limited |
| Project Description | The Installation of a storage tank for produced (salt) water at the South Quarry Gathering station and the injection station(s) and a pipeline system to transport produced (salt) water |
| Designated Activity | 25 |
| Location | South Quarry Farmout Block, Santa Flora |
| Status | Issued CEC |
| Status Date | 2016-09-23 |