| ITEM | DETAILS |
|---|---|
| CEC # | 4864 |
| Year | 2016 |
| Date Received | 2016-05-20 |
| Applicant | Range Resources Trinidad Limited |
| Project Description | The installation of pump station along with 6.9 Km of a 152mm (6 inch) pipeline |
| Designated Activity | 25 |
| Location | from South Quarry Farmout Block to the Morne Diablo Farmout Block, South Trinidad |
| Status | Issued CEC |
| Status Date | 2016-08-22 |