| ITEM | DETAILS |
|---|---|
| CEC # | 4552 |
| Year | 2015 |
| Date Received | 2015-05-11 |
| Applicant | The Petroleum Company of Trinidad and Tobago Limited (Petrotrin) |
| Project Description | Replacement and installation of 3.3528km (11,000 feet) of 35.56 cm (14 inch) diameter natural gas pipeline between sudma village, (No Suggestions) to compressor station #12 at Santa Flora along an existing right of way |
| Designated Activity | 27 |
| Location | between Sudama Village, Fyzabad and Compressor Station #12 Santa flora |
| Status | Issued CEC |
| Status Date | 2015-07-07 |