| ITEM | DETAILS |
|---|---|
| CEC # | 4351 |
| Year | 2014 |
| Date Received | 2014-11-06 |
| Applicant | Shell Trinidad Limited |
| Project Description | Removal and replacement of 2200 ft of an 8 inch pipeline for the transport of base oil from SP1N to Shell's facility |
| Designated Activity | N/A |
| Location | along the PCS Corridor, Point Lisas |
| Status | No CEC Required |
| Status Date | 2014-12-24 |