ITEM DETAILS
CEC #4299
Year2014
Date Received2014-08-25
ApplicantThe Petroleum Company of Trinidad and Tobago Limited (Petrotrin)
Project DescriptionThe installation of 7010.4 m (23,000 feet) of a 152.4 mm (6 inch) diameter water pipeline for enhanced oil recovery projects
Designated Activity40(a)
LocationFrom Cruse to Guapo within the Guapo Field, Point Fortin
StatusIssued CEC
Status Date2014-10-13