| ITEM | DETAILS |
|---|---|
| CEC # | 4157 |
| Year | 2014 |
| Date Received | 2014-03-24 |
| Applicant | PCS Nitrogen Trinidad Limited |
| Project Description | The installation of a 2134 m long, 254 mm diameter pipeline for the export of process water from PCS Nitrogen to Powergen and a 2438 m long, 601-mm diameter pipeline for the import of medium pressure steam from Powergen to PCS Nitrogen |
| Designated Activity | 40(a),40(b) |
| Location | Point Lisas Industrial Estate, Point Lisas |
| Status | Issued CEC |
| Status Date | 2014-05-13 |