ITEM DETAILS
CEC #4157
Year2014
Date Received2014-03-24
ApplicantPCS Nitrogen Trinidad Limited
Project DescriptionThe installation of a 2134 m long, 254 mm diameter pipeline for the export of process water from PCS Nitrogen to Powergen and a 2438 m long, 601-mm diameter pipeline for the import of medium pressure steam from Powergen to PCS Nitrogen
Designated Activity40(a),40(b)
LocationPoint Lisas Industrial Estate, Point Lisas
StatusIssued CEC
Status Date2014-05-13