ITEM DETAILS
CEC #4039
Year2013
Date Received2013-10-28
ApplicantMinistry of the Environment and Water Resources,Drainage Division
Project DescriptionThe construction of new dykes and strengthening of existing dykes for flood control
Designated Activity8(a),41(b,c)
Locationalong Sections of the St. Joseph River, Tunapuna, Tacarigua, Oropuna and Caroni River Basins in the Caroni Drainage Basin
StatusIssued CEC
Status Date2014-05-07