ITEM DETAILS
CEC #3951
Year2013
Date Received2013-07-29
ApplicantWater and Sewerage Authority (WASA)
Project DescriptionThe installation of 35 km of transmission main pipeline and its appurtenances including bridge and culvert crossings and road reinstatement and the installation of storage tanks
Designated Activity40(b)
Locationfrom the proposed Beetham Wastewater Re-use Plant at Beetham to Point Lisas for water storage at the Point Lisas Industrial Estate
StatusIssued CEC
Status Date2014-04-14