| ITEM | DETAILS |
|---|---|
| CEC # | 3951 |
| Year | 2013 |
| Date Received | 2013-07-29 |
| Applicant | Water and Sewerage Authority (WASA) |
| Project Description | The installation of 35 km of transmission main pipeline and its appurtenances including bridge and culvert crossings and road reinstatement and the installation of storage tanks |
| Designated Activity | 40(b) |
| Location | from the proposed Beetham Wastewater Re-use Plant at Beetham to Point Lisas for water storage at the Point Lisas Industrial Estate |
| Status | Issued CEC |
| Status Date | 2014-04-14 |