ITEM DETAILS
CEC #3787
Year2013
Date Received2013-01-31
ApplicantMethanol Holdings Trinidad Limited
Project DescriptionThe construction of a 50,000m3 methanol storage tank, a 410-m long, 304.8-mm (12-inch maximum diameter) methanol pipeline and a general laydown yard
Designated Activity8(a)(b),29,41(a)
LocationPoint Lisas Industrial Estate, Point Lisas
StatusIssued CEC
Status Date2013-03-18