ITEM DETAILS
CEC #3520
Year2012
Date Received2012-06-06
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionThe establishment of a 50 mm (2") diameter, 10 m in length natural gas pipeline, a pre-fabricated metering station and a compressed natural gas filling station
Designated Activity26(b)27
Locationat NGC Limited's Field Office, Greenland Drive, Point Lisas Industrial Estate, Point Lisas
StatusIssued CEC
Status Date2012-08-29