| CEC # | 3439 |
| Year | 2012 |
| Date Received | 2012-04-02 |
| Applicant | BP Trinidad and Tobago LLC (BPTT) |
| Project Description | The establishment of the Juniper Platform, the installation of a subsea production system inclusive of five (5) subsea development wells and a 30.5 cm (12-inch) diameter import flow lines, a single manifold, umbilical and 30.5 cm diameter import risers an |
| Designated Activity | 25 |
| Location | within the Juniper Field, located approximately 84 km offshore, east of Galeota Point, Trinidad |
| Status | Issued CEC |
| Status Date | 2015-03-24 |