| ITEM | DETAILS |
|---|---|
| CEC # | 3438 |
| Year | 2012 |
| Date Received | 2012-04-02 |
| Applicant | BP Trinidad and Tobago LLC (BPTT) |
| Project Description | The establishment of a produced water treatment facility and a condensate handling facility at Trinity Road, Guayaguayare, the installation of two (2) 152.4mm (6") onshore gas pipelines and the installation of a produced water outfall line, a condensate e |
| Designated Activity | 8(a)13(b)26(a)26(b)272933(a)3641(c)42 |
| Location | Offshore the South-East Coast of Trinidad |
| Status | Application Withdrawn |
| Status Date | 2012-09-20 |