| ITEM | DETAILS |
|---|---|
| CEC # | 3412 |
| Year | 2012 |
| Date Received | 2012-03-14 |
| Applicant | BG Trinidad and Tobago Limited (BGTT) |
| Project Description | The modification of a normally unmanned installation to a normally manned installation by upgrading the accommodation module, operations centre, helideck and utility systems at the Poinsettia Platform |
| Designated Activity | 26(a)42 |
| Location | NCMA 1 Block, offshore the North Coast, Trinidad |
| Status | Issued CEC |
| Status Date | 2012-05-01 |