ITEM DETAILS
CEC #3305
Year2011
Date Received2011-11-01
ApplicantWater and Sewerage Authority (WASA)
Project DescriptionThe installation of a 10 inch (280mm) diameter wastewater force main for a distance of 2.9 kilometres
Designated Activity40(b)
Locationfrom the C-24 wastewater pumping station, Western Main Road to the Point Gourde WTP, Chaguaramas
StatusIssued CEC
Status Date2011-12-23