| ITEM | DETAILS |
|---|---|
| CEC # | 3192 |
| Year | 2011 |
| Date Received | 2011-07-25 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | The establishment of a 50 mm (2") diameter natural gas pipeline, 300 m in length, tapping off from an existing pipeline along the Uriah Butler Highway to the Medford Brentwood Service Station, and a metering station to provide fuel for the compressed natu |
| Designated Activity | 27 |
| Location | Brentwood Boulevard, Chaguanas |
| Status | Issued CEC |
| Status Date | 2011-10-04 |