ITEM DETAILS
CEC #3192
Year2011
Date Received2011-07-25
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionThe establishment of a 50 mm (2") diameter natural gas pipeline, 300 m in length, tapping off from an existing pipeline along the Uriah Butler Highway to the Medford Brentwood Service Station, and a metering station to provide fuel for the compressed natu
Designated Activity27
LocationBrentwood Boulevard, Chaguanas
StatusIssued CEC
Status Date2011-10-04