ITEM DETAILS
CEC #3158
Year2011
Date Received2011-06-07
ApplicantThe Petroleum Company of Trinidad and Tobago Limited (Petrotrin)
Project DescriptionThe replacement of 8,000 feet (2.44 km) of a 3-inch (76.2 mm) diameter crude oil pipeline with a 4.5-inch (114.3 mm) diameter pipeline
Designated Activity27
LocationTrinity to Edward Trace, Moruga
StatusIssued CEC
Status Date2011-07-29