| ITEM | DETAILS |
|---|---|
| CEC # | 3127 |
| Year | 2011 |
| Date Received | 2011-05-10 |
| Applicant | Water and Sewerage Authority (WASA) |
| Project Description | The installation of approximately 5.5 km of a 200 mm water distribution pipeline and its appurtenances including interconnections to an existing 20-inch transmission line and side streets, service connections, bridge and culvert crossings and road reinsta |
| Designated Activity | 40(b) |
| Location | Rio Claro (Naparima Mayaro Road) |
| Status | Issued CEC |
| Status Date | 2011-07-04 |