ITEM DETAILS
CEC #3009
Year2010
Date Received2010-12-20
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionThe installation of a 50 mm (2") natural gas pipeline, 136 m in length, tapping from an existing pipeline at Gordon Street to the Mt. Hope Government Secondary School, and a metering station to provide fuel to the air-conditioning system
Designated Activity27
LocationGordon Street, Mt. Hope
StatusIssued CEC
Status Date2011-07-15