| ITEM | DETAILS |
|---|---|
| CEC # | 3009 |
| Year | 2010 |
| Date Received | 2010-12-20 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | The installation of a 50 mm (2") natural gas pipeline, 136 m in length, tapping from an existing pipeline at Gordon Street to the Mt. Hope Government Secondary School, and a metering station to provide fuel to the air-conditioning system |
| Designated Activity | 27 |
| Location | Gordon Street, Mt. Hope |
| Status | Issued CEC |
| Status Date | 2011-07-15 |