| ITEM | DETAILS |
|---|---|
| CEC # | 2888 |
| Year | 2010 |
| Date Received | 2010-06-29 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | The establishment of a 50 mm (2") natural gas pipeline, 1km in length tapping off from an existing pipeline at El Socorro to the Aranguez Government Secondary School and a metering station to provide fuel to the air-conditioning system |
| Designated Activity | 27 |
| Location | El Socorro to Aranguez |
| Status | Issued CEC |
| Status Date | 2010-12-20 |