ITEM DETAILS
CEC #2888
Year2010
Date Received2010-06-29
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionThe establishment of a 50 mm (2") natural gas pipeline, 1km in length tapping off from an existing pipeline at El Socorro to the Aranguez Government Secondary School and a metering station to provide fuel to the air-conditioning system
Designated Activity27
LocationEl Socorro to Aranguez
StatusIssued CEC
Status Date2010-12-20