| ITEM | DETAILS |
|---|---|
| CEC # | 2749 |
| Year | 2009 |
| Date Received | 2009-12-16 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | Installation of a main valve upstream of the Picton Valve Station along the existing 406MM (16") diameter Gas line |
| Designated Activity | 27 |
| Location | Barrackpore (Upstream of the Picton Valve Station) |
| Status | Issued CEC |
| Status Date | 2010-04-22 |