ITEM DETAILS
CEC #2720
Year2009
Date Received2009-10-21
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionModifications to an existing 24" natural gas pipeline by installation of by-passes at the valve station and slug catcher facilities, and installation of 48 meters of four (4") inch pipeline to connect the existing natural gas supply to the new pipeline se
Designated Activity27(a)
LocationGaleota Point
StatusIssued CEC
Status Date2009-12-18