| ITEM | DETAILS |
|---|---|
| CEC # | 2720 |
| Year | 2009 |
| Date Received | 2009-10-21 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | Modifications to an existing 24" natural gas pipeline by installation of by-passes at the valve station and slug catcher facilities, and installation of 48 meters of four (4") inch pipeline to connect the existing natural gas supply to the new pipeline se |
| Designated Activity | 27(a) |
| Location | Galeota Point |
| Status | Issued CEC |
| Status Date | 2009-12-18 |