| ITEM | DETAILS |
|---|---|
| CEC # | 2692 |
| Year | 2009 |
| Date Received | 2009-09-15 |
| Applicant | BG Trinidad and Tobago Limited (BGTT) |
| Project Description | The modification of the control systems to increase the operating capacity of the plant from 65 MMSCFD to 80 MMSCFD of natural gas at the Central Block, Evergreen Gas Processors Facility |
| Designated Activity | N/A |
| Location | Central Block, Evergreen Gas Processors Facility, Moruga |
| Status | No CEC Required |
| Status Date | 2009-10-01 |