ITEM DETAILS
CEC #2671
Year2009
Date Received2009-08-11
ApplicantThe Petroleum Company of Trinidad and Tobago Limited (Petrotrin)
Project DescriptionThe use of cyclic steam injection via a portable steam generator into a maximum of 8 existing production wells, and the installation of associated 3-inch natural gas lines, 4-inch PVC water lines and 2-inch steam lines, to test for enhanced crude oil prod
Designated Activity25(a),27(a)
LocationForest Reserve and Fyzabad North
StatusIssued CEC
Status Date2009-09-22