| ITEM | DETAILS |
|---|---|
| CEC # | 2671 |
| Year | 2009 |
| Date Received | 2009-08-11 |
| Applicant | The Petroleum Company of Trinidad and Tobago Limited (Petrotrin) |
| Project Description | The use of cyclic steam injection via a portable steam generator into a maximum of 8 existing production wells, and the installation of associated 3-inch natural gas lines, 4-inch PVC water lines and 2-inch steam lines, to test for enhanced crude oil prod |
| Designated Activity | 25(a),27(a) |
| Location | Forest Reserve and Fyzabad North |
| Status | Issued CEC |
| Status Date | 2009-09-22 |