ITEM DETAILS
CEC #2653
Year2009
Date Received2009-07-21
ApplicantThe National Gas Company of Trinidad and Tobago Limited (NGC)
Project DescriptionTo establish a 102mm (4") internal diameter, 60m long natural gas pipeline from a hot tap off the NGC of Trinidad and Tobago Limited's existing 914mm (36") Loop to Ring Main, and ending at Carisal Unlimited's compound at Pt. Lisas, operating at a pressure
Designated Activity27(a)
LocationPoint Lisas
StatusIssued CEC
Status Date2009-09-01