| ITEM | DETAILS |
|---|---|
| CEC # | 2653 |
| Year | 2009 |
| Date Received | 2009-07-21 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | To establish a 102mm (4") internal diameter, 60m long natural gas pipeline from a hot tap off the NGC of Trinidad and Tobago Limited's existing 914mm (36") Loop to Ring Main, and ending at Carisal Unlimited's compound at Pt. Lisas, operating at a pressure |
| Designated Activity | 27(a) |
| Location | Point Lisas |
| Status | Issued CEC |
| Status Date | 2009-09-01 |