| ITEM | DETAILS |
|---|---|
| CEC # | 2612 |
| Year | 2009 |
| Date Received | 2009-05-29 |
| Applicant | The National Gas Company of Trinidad and Tobago Limited (NGC) |
| Project Description | The decommissioning and re-establishment of the existing Petroleum Company of Trinidad and Tobago Limited metering station and the establishment of a 406mm (16") internal diameter, 102.2m long natural gas pipeline inclusive of a 406mm (16") internal diame |
| Designated Activity | 27(a) |
| Location | Pointe-a-Pierre |
| Status | Issued CEC |
| Status Date | 2009-12-01 |