| ITEM | DETAILS |
|---|---|
| CEC # | 2607 |
| Year | 2009 |
| Date Received | 2009-05-18 |
| Applicant | Trinidad and Tobago Electricity Commission (T&TEC) |
| Project Description | Diversion of the existing Sangre Grande - San Rafael 66 kV single-circuit steel pole line into the Wallerfield Substation. |
| Designated Activity | N/A |
| Location | Cumuto, Wallerfield |
| Status | No CEC Required |
| Status Date | 2009-06-01 |