| ITEM | DETAILS |
|---|---|
| CEC # | 2502 |
| Year | 2009 |
| Date Received | 2009-01-13 |
| Applicant | The Petroleum Company of Trinidad and Tobago Limited (Petrotrin) |
| Project Description | Replacement and Installation of a Forty Two Hundred (4200 ft) of a Twenty Eight inch (28 inch) crude oil pipelines with 1 Twelve inch (12) oil pipeline from apex manifold to compressor station |
| Designated Activity | 27 |
| Location | Fyzabad |
| Status | Issued CEC |
| Status Date | 2009-02-25 |