| ITEM | DETAILS |
|---|---|
| CEC # | 1826 |
| Year | 2007 |
| Date Received | 2007-03-07 |
| Applicant | The Petroleum Company of Trinidad and Tobago Limited (Petrotrin) |
| Project Description | To Re-route and Install two(2) Oil and two(2) Gas Pipelines which are alongside the Proposed Highway Route from Golconda to Point Fortin |
| Designated Activity | 27(a) |
| Location | Golconda to Point Fortin |
| Status | Application Withdrawn |
| Status Date | 2013-09-12 |