| ITEM | DETAILS |
|---|---|
| CEC # | 1815 |
| Year | 2007 |
| Date Received | 2007-03-01 |
| Applicant | Damus Oil Limited,Damus Limited |
| Project Description | The construction and installation of two(2),1000 bbls crude oil storage tanks |
| Designated Activity | 25 |
| Location | at the existing Damus Tank Battery Facility (TB 1),Coora Road Santa Flora |
| Status | Issued CEC |
| Status Date | 2007-05-08 |