ITEM DETAILS
CEC #1296
Year2005
Date Received2005-12-29
ApplicantEssar Steel Caribbean Limited
Project Descriptionclearing, grading, cutting and back filling of 203ha of land. The construction of Integrated Steel Complex consisting of 4.5 MTPY Pellet Plant, 2x1.5 MTPY HBI, 2.7 MMTPY HRC- electricity arc furnace, slab caster, hot strip mill, 160 MW+ 160 MW CPP, 360 m3
Designated ActivityN/A
LocationPoint Lisas
StatusNo CEC required
Status Date2006-03-09