| ITEM | DETAILS |
|---|---|
| CEC # | 1285 |
| Year | 2005 |
| Date Received | 2005-12-12 |
| Applicant | BHP Billington (Trinidad -2C) Limited |
| Project Description | Modification of existing facilities to optimise the production of crude oil, inclusive of pipeline installation and drilling of two gas producing wells |
| Designated Activity | 25 |
| Location | Angostura Field, Block 2(c) off the Northeast Coast |
| Status | Issued CEC |
| Status Date | 2006-02-14 |